Лазарев А. А., Архипов Д.И. Д. И., Battaia O. O., , in: IFAC-PapersOnLineVol. V.50. Issue 1.: Editions Elsevier, 2017. Ch. 50 P. 7970–7974.
In this paper, a long-term production planning problem is considered with the objective criteria Cmax and Tmax and under resource capacity and precedence constraints. The case study presented is characterized by four years planning horizon, 3552 operations, 51 workers and 57 units of equipment. The solution method elaborated in this study is a heuristic algorithm. ...
Added: October 20, 2017
Averboukh Y., Volkov A., Dynamic Games and Applications 2024 Vol. 14 P. 285–303
The planning problem for the mean field game implies that one tries to transfer the system of infinitely many identical rational agents from the given distribution to the final one using the choice of the terminal payoff. It can be formulated as the mean field game system with the boundary condition only on the distribution. ...
Added: June 27, 2025
Tikhonov E., Schneps-Schneppe D., Namiot D., , in: Proceedings of the 26th Conference of Open Innovations Association FRUCT.: IEEE, 2020. P. 438–448.
The article is devoted to the analysis of the effectiveness of the DTN (Delay Tolerant Network) system in a communication network on a railway line. Trains act as moving objects that are sending and receiving messages to/from an external network. As well trains may transmit telemetry, collected during movement. The article presents data on effectiveness ...
Added: April 9, 2022
Solodovnikov V. V., Логистика и управление цепями поставок 2018 № 1 (84) С. 86–95
This article is a continuation of the series of articles devoted to the creation of industry-specific practical methodology of supply chain planning of industrial enterprises (on the example of iron and steel complexes).
The article presents the results of a survey of the process of operational planning of supply chains for metallurgical enterprises. Based on the ...
Added: May 9, 2020
Solodovnikov V. V., Konvicka D., , in: IMCSM ProceedingsIssue 2.: University of Belgrade, Technical Faculty in Bor, Department of Engineering Management, 2018. Ch. 1 P. 60–69.
The paper examines strategically important management tool - Advanced Planning and Scheduling systems (APS systems) and their efficiency in Demanding Planning Environment. The key characteristics of Demanding Planning Environments are systematized: the uniqueness of the technological processes; high complexity and scope; limited ability to describe and low predictability; high volatility and change sensitivity. The new ...
Added: July 19, 2018
Solodovnikov V. V., Konvicka D., , in: Foundry 2018. Proceeding of the XXV International Scientific and Technical ConferenceIssue 1 (2).: Sofia: Scientific Technical Union of Mechanical Engineering "INDUSTRY-4.0", 2018. P. 3–6.
The paper analyzes melt shop and caster scheduling at special steel maker – Trinecke Zelezarny. The main optimization objectives of melt shop and caster scheduling are defined as: minimization of earliness and lateness of orders, maximization of tundish utilization, minimization of steel grade changes and minimization of mold width changes, minimization of stock, minimization of over grading, management ...
Added: April 30, 2018
Pei J., Pardalos P. M., Liu X. et al., Journal of Industrial and Management Optimization 2015 Vol. 11 No. 2 P. 399–419
This paper investigates a three-stage supply chain scheduling problem in the application area of aluminium production. Particularly, the first and the third stages involve two factories, i.e., the extrusion factory of the supplier and the aging factory of the manufacturer, where serial batching machine and parallel batching machine respectively process jobs in dierent ways. In ...
Added: September 10, 2014