?
Diagnostics of the Very Responsible Projects
Abstract. When performing any work of the project there can be a mistake, which is also a deviation from the established requirements. The rational choice of control points is an effective method of decrease in time of restoring a regularity of implementation of the project when mistakes in works appeared. In this paper several methods of arrangement of control points in the very responsible projects – the projects directed to obtaining especially responsible result - are offered. They are based on the principle of maximization of the information. The diagnostic model of the project and the mathematical model of emergence of mistakes in works of the project are developed for using these methods. The criteria for comparison of options of arrangement of control points is developed as well as the algorithms and the software for the experimental check of effectiveness of the offered methods and their practical application to arrangement of control points in real projects. The experiment directed to assessment of effectiveness of each of the offered methods is made. Results of an experiment showed expediency of use of all methods as a part of a complex and its high performance.